● We always run monthly de-briefing in the beginning of each month to discuss with the interviewers all the issues in the field.
● Supervisors and Interviewers who are well experienced in tracking studies category are assigned to project.
● Each interviewer report to Supervisor twice in a week .
● Back checks are usually done (40-45% at total) by different department.
● The above back checks are carried out on the bases of KPI.
● Field Locations/area are assigned and set post consultation with client and the same locations are visit in different wave/track to avoid any discrepancies of data.
● Quota are generally monitored on daily and weekly bases to ensure to meet the weekly and monthly set target
● In case of any field interviewer are required to induct then new The new interviewers will be attending live interviews for one week before replacing /starting the actual interviews
● For team backup , we always train additional 3-4 interviewers so in case of any drop out during the field can be covered that vacuum with stand by team.
● Every interviewers data are being analyze on weekly and monthly bases to monitor the fieldwork quality
Copyright © 2018 Bright Future. Design by Egygate Solution